After $2 billion spent on its design and construction, “Desertron” or the Superconducting Super Collider was cancelled in 1993 due to rising cost estimates of up to $12 bn USD
Source • Posted on 2024/04/18 • Report as duplicate • Report
r/damnthatsinteresting u/winterchampagne